Projects

Buildings that speak for us

Residences, homes in the Zielone Osiedla estates in Chyby, offices and warehouses. Selected work from over 30 years.

Award-winning project · Quadro 2023

Złamany Dom

A three-storey, 345 m² family home in Poznań, designed by Ultra Architects, received the 2023 Jan Baptysta Quadro Award of the Mayor of Poznań for the best building completed in the city. On difficult, sloping ground we built a reinforced concrete structure, left as raw concrete inside, and a facade of larch battens. The photos follow the build from the foundations to the finished house.

Residences

Homes built to last

Homes and residences from about 300 to 2,000 m², built from the foundations to turnkey. A house of about 300 m² takes about a year, a residence of about 2,000 m² two to three years.

Interiors

Premium finishing

Installations

Ceiling heating in the attic

We install ceiling heating before the walls and ceilings are finished. The heat comes from the ceiling, so no radiators take up space on the walls or under the windows.

On site

Solid from the ground up

Shelters

Installing armoured doors

Armoured doors for safe rooms arrive on site in wooden crates and are set in place by crane. The photos show transport and installation.

Warehouses

From rebar to a finished hall

Reinforcing and pouring the floor slab, and the finished hall interior. A warehouse of about 2,000 m² usually takes about 10 months.

Special project · Berlin

A furnace for an aluminium smelter

We built a furnace for an aluminium smelter in Berlin. The photos show the stages of work: excavation and foundation reinforcement, formwork, the reinforced foundation slab, channel insulation, the reinforced concrete furnace pit, the refractory brick lining and the vaulted channels.

Testimonials

In the words of our clients and architects

We do not publish our clients' names or addresses. Private references are available on request.

At the design stage, Waldemar Gryz noticed that the terrace above the underground garage did not have the right fall for drainage. Together with the architect he proposed a better solution before the first formwork went up. The house is 850 m², construction took 26 months, and the same team worked with us the whole time.
ClientResidence with an underground level · near Poznań · 2023
I discuss the design with GAPBUD before construction starts. Waldemar Gryz reads drawings as a builder and as a future resident at the same time. On one residence he proposed moving a service shaft, so the living room ceiling did not have to be lowered. The client gained 30 cm of height, and the design lost nothing.
ArchitectArchitecture studio · Poznań
I inspected the reinforcement, the waterproofing of the underground level and the slabs. Before every inspection the photo documentation was ready. What I value most is that Waldemar Gryz raised questions about the structural design well in advance, always with a proposed solution, not on the day of the concrete pour.
Client-side site inspectorLicensed structural engineer
Before we chose the windows and facade, Waldemar Gryz took us to two houses where the same solutions have stood for years. At our very first meeting he noticed that on our plot the living room would sit in the garage's shadow for most of the day, and together with the architect he proposed rotating the building. It was the best decision of the whole build.
ClientsTurnkey house · Wielkopolska · 2022
Waldemar Gryz proposed changing the layout of the gates and loading ramp from the design, because he had first checked how trucks would manoeuvre in the yard. The 2,000 m² warehouse was handed over in 10 months, on schedule.
CEO of a logistics companyWarehouse · Wielkopolska
In person

More photos and a site visit

We publish selected photos without addresses, out of respect for our clients. On request we will show you more photos of selected projects and walk you through finished buildings in and around Poznań.

Arrange a meeting